Check out Highland! Inside the building, casework is being installed and classroom walls are being painted. The commons area has been framed and is awaiting the installation of drywall. The mechanical, electrical and plumbing is nearing completion throughout the building. On the exterior, the masonry and metal siding installation is ongoing. The central courtyard is being cut to rough grade and the padding material (e-layer) for the artificial turf main field is being installed.